Client:
Ultimate Design and Build
Quantity:
30 lineal metres
Timeline:
4 days
Summary:
The third of many projects we’ve completed for Ultimate Design and Build, we were contracted once again to install a timber retaining wall, but this time for an extension of an existing home. This wall proved difficult as existing fencing was in close proximity to the boundary line. Services such as sewerage and stormwater were also likely to be damaged as they passed through pier holes to be drilled. To overcome these obstacles, our experienced team located all connected services at risk and utilised an A + B style excavation – only excavating where the pier holes were to be drilled. This ensured that the fence had as much support during construction without collapse, and we also propped these fences for maximum strength.
Contact US

Ready to start breaking ground?

Fill in your details below to tell us more about your project, and we’ll prepare an obligation-free estimate ASAP. Alternatively, call us at 0483 370 554 to speed up the process.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.