Client:
NBC Civil Constructions
Quantity:
500 lineal metres, 400mm - 3.6 metres high
Timeline:
2 months
Summary:
NBC Civil Constructions contracted us for a challenging project, to complete a large section of retaining walls required for the new Coles Traralgon construction project by Insitu Group. Staged in two phases, the project required us to stay on-site for the entirety of the project as we installed over 500LM of engineered concrete sleeper retaining walls, 400mm to 3.6M high. We had to install our walls before the precast walls and slabs, millimetres apart, could be placed, requiring precise planning and execution to avoid delays. Integrating footings in collaboration with Solid Foundations Concreting helped overcome an engineering mistake in the precast wall, and we had to laminate sleepers to double thickness to rectify this issue. Another project that demonstrates our unique ability to adapt quickly to changes/additions on-site, ensuring seamless completion under budget without disrupting other trades.
Contact US

Ready to start breaking ground?

Fill in your details below to tell us more about your project, and we’ll prepare an obligation-free estimate ASAP. Alternatively, call us at 0483 370 554 to speed up the process.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.